4. Pockets Hill Studios The studios have been modernised to meet DTT requirements 5. Kotwa New transmission tower has been constructed. DTT equipment has been installed and site ready for transmission. 6. Mudzi Fully equipped and ready for DTT transmission. FM transmitters have also been installed 7. Karoi Tower was refurbished and full deployment of DTT equipment has been completed 8. Chivhu Tower was refurbished and the site has full set of equipment to offer DTT services 9. Mutorashanga 10. Mutare 11. Nyanga Full complement of equipment has been installed. Site ready for DTT. Test running equipment Full complement of DTT equipment installed and ready. FM transmitters also installed 12. Chimanimani Installation of DTT equipment completed site ready to offer services 13. Honde valley New tower has been constructed. Equipment is yet to be installed 14. Buhera Tower still in early stages of construction 15. Gweru Full set of DTT equipment in place ready for transmission 16. Kadoma DTT Equipment in place. Site ready. 17. Gokwe Equipment in place ready for DTT 18. Siyabuwa –Chitekete site New tower has been put up. No DTT or FM equipment has been installed 19. Zvishavane New tower has been erected. No DTT equipment has been installed. Only FM services are currently on offer 20. Bulawayo Site fully equipped with DTT hardware and ready . Test running the equipment 21. Montrose studios 22. Lupane 23. Kamativi 6 Ready to offer DTT services The modernisation of the studio is not yet complete. The site at kenmaur has been equipped with DTT equipment , DTT ready DIGITAL TERRESTRIAL TELEVISION MIGRATION IN ZIMBABWE - CHALLENGES & OPPORTUNITIES